Structural Precast Concrete
(Section 03411)
PART 3 - EXECUTION ⇒ part 1 | part 2
3.01 INSPECTION
- VERIFICATION OF EXISTING CONDITIONS:
- The erection contractor shall verify that the structure and surfaces to receive prestressed concrete are accurately sized
and located, sound, true, and otherwise properly prepared.
- The general contractor shall be notified prior to the start of work of any conditions requiring correction.
- Work shall not be started until conditions are satisfactory.
3.02 INSTALLATION
- ERECTION:
- Follow the manufacturer’s directions and approved shop drawings.
- Locate slabs accurately within allowable tolerances.
- Stabilize slabs securely during erection.
- Anchor slabs securely and permanently as indicated on approved shop drawings.
- Remove any temporary bracework upon completion.
- ATTACHMENTS:
- Secure as shown on drawings.
- Members may be drilled or “shot” provide no contact is made with prestressing steel, subject to the approval of the architect / engineer.
3.03 FINISHING
- PATCHING:
- Patching will be acceptable providing structural adequacy and appearance are not impaired.
- JOINT GROUTING:
- After the installation of any attachments or hangers that pass through joints between slabs, fill the joints completely with grout
3.04 PREPARATION FOR TOPPING SLABS
- PRIOR TO PLACING TOPPING:
- Clean and wet the top surface to surface saturated dry condition (SSD).